Audits

SWITCH AUDITS

  • WORK WITH REQUIRED PARTIES FOR SCHEDULING AND ACCESS
  • SITE SPECIFIC DATA RECORDED
  • END TO END CIRCUIT VERIFICATION AND DOCUMENTATION
    • TO INCLUDE ROW/RACK/ RMU LOCATION OF EQUIPMENT/ DETAILED INFO OF EQMT/ CIRCUIT TYPE/ DETAILED INFO OF CIRCUIT/ IF ACTIVE/ PORT ASSIGNMENTS ON BOTH ENDS
  • DRAWING LAYOUT OF SWITCH ROOM/ CAGE(S)
  • DIAGRAM OF EACH RACK WITH RMU SPACING OF SHELFS/ EQMT
  • DETAILED DIAGRAM OF AC-DC POWER/ BATTERY BAY W POWER READINGS
  • TRANSPORT CIRCUIT IDS RECORDED
  • ASSET AUDIT
  • PICTURES OF SWITCH ROOM/ EACH INDIVIDUAL RACK(S) WITH EQMT

CELL SITE CONSTRUCTION WALKS

  • WORK WITH REQUIRED PARTIES FOR SCHEDULING AND ACCESS
  • WALK-SPECIFIC DATA RECORDED
  • SITE SPECIFIC DATA RECORDED
  • COMPOUND LAYOUT IF REQUIRED
  • EQUIPMENT LAYOUT IF REQUIRED
  • TOWER HEIGHT/ RAD CENTER(S)/ AZIMUTHS RECORDED
  • ASSET VERIFICATION
  • SPACE AVAILABILITY
  • EXISTING AC-DC POWER/ TELCO INFO DOCUMENTED
  • REQUIRED PICTURES TO SUPPORT WALK

NEW SITE WALKS/ RAWLAND

  • WORK WITH REQUIRED PARTIES FOR SCHEDULING AND ACCESS
  • WALK-SPECIFIC DATA RECORDED
  • WORK WITH LANDLORD/ PROPERTY OWNER AND CLIENT ON BEST LOCATION(S)
  • MARK AND TAKE PICTURES OF AGREED DEMINSIONS USING CONES, FLAGS, SPRAY PAINT
  • LOCATE, MEASURE AND CREATE DIAGRAM OF DISTANCES TO CLOSET POWER AND TELCO OSP
  • REQUIRED PICTURES TO SUPPORT WALK

CELL SITE AUDITS

  • WORK WITH REQUIRED PARTIES FOR SCHEDULING AND ACCESS
  • WALK-SPECIFIC DATA RECORDED
  • SITE SPECIFIC DATA RECORDED
  • COMPOUND LAYOUT IF REQUIRED
  • EQUIPMENT LAYOUT IF REQUIRED
  • EXISTING AC-DC POWER/ TELCO INFO DOCUMENTED
  • ASSET INVENTORY
  • REQUIRED PICTURES TO SUPPORT AUDIT

QUALITY AUDITS

  • WORK WITH REQUIRED PARTIES FOR SCHEDULING AND ACCESS
  • WALK-SPECIFIC DATA RECORDED
  • SITE SPECIFIC DATA RECORDED
  • FINAL EQUIPMENT LAYOUT IF REQUIRED
  • VERIFY INSTALLATION QUALITY AND REQUIREMENTS MEET STANDARDS
  • ASSET INVENTORY
  • RECORD SPECIFIC READINGS AS REQUIRED
  • REQUIRED PICTURES TO SUPPORT AUDIT

CELL SITE 3RD PARTY AUDITS

  • GENERATORS
  • HVAC UNITS
  • MICROWAVE
  • AAV(FIBER)-MMP/ MPOE/ DEMARK/ RUN LAYOUT
  • AC POWER- MMP/ MPOE/ RUN LAYOUT
  • DC POWER PLANTS
  • TOWERS

NEW BUILDS AND UPGRADES

  • REMOTE SITE INCLUDING PERMITS, CARRIER TECHNOLGY BOTH INDOOR AND OUTDOOR APPLICATIONS INCLUDING ALL CLOSEOUT ACTIVITIES, PIM AND SWEEPS TESTING AND
  • DAS INSTALLS FOR AT&T LUCENT EQUIPMENT AND NOKIA AND SOON SAMSUNG. FOR VENUES INCLUDING BUT NOT LIMITED TO MANY UNIVRERSITIES, FEDERAL AGENCIES AND THE REPUBLIC CONVENTION. FIDELITIE INVETMENTS (MULTIPLE CAMPUSES) AND SEVERAL STADIUMS NATION WIDE.
  • SMALL CELLS FOR VERIZON WIRELESS NOKIA EQUIPMENT FOR ROYAL FARMS, WALMART AND OTHER VARIOUS CITES IN THE NORTH EAST.
  • 3RD PARTY PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT AND AUDIT REVIEWS.

SITE SUPPORT WORK

  • HVAC SWAP OUTS AND NEW INSTALLS
  • GENERATOR SWAP OUT INDOOR SHELTERS AND OUTDOOR PAD ALSO NEW GENERATOR INSTALLS
  • POWER PLANT SWAP OUTS AND (HOT SWAP) CELL SITE, HUBS, AND SWITCHES
  • SITE COMPOUND LANDSCAPING

SHELTER / TOWER

  • SHELTER ACQUISITION NEW AND USED, RELOCATION AND SALES, SHELTER RECONDITIONING.
  • TOWER REMOVAL AND RESALE
  • LOCATION OF DERALICT COMM EQUIPMENT AND RESALE

FIBER INTERCONNECT

  • PROJECT MANAGEMENT
  • CONSTRUCTION MANAGEMENT
  • FIBER UTILIZATION DESIGN
  • FIBER SPLICING
  • REEL VERIFICATION
  • OTDR VERIFICTION
  • FULL DOCUMENTATION
  • HEAD END WORK.
  • UNDERGROUND AND AERIAL CONSTRUCTION